Experiences: Ground Based Systems
Gram Vikas
The key here is the design of a completely off-grid solution for 24 X 7 operations in a remote location. The land available was rocky and the contour not even. The battery design was to be optimized for DOD and the mounting design had to be completely customized to fit on to the difficult terrain.