Experiences: University/School Campus
Brahma Kumaris
The key here is the design of a 18 X5 Hybrid system with automatic switching between Solar, Grid, Batteries and DG. The other highlight was phased execution of the project in phases of 100 KW. This is a rooftop system with roof-profiles in all directions and angles.